Free calculators and converters. No sign-up, no cost.

Your measurements

What you are laying
If you do not have a count yet, run the block or brick calculator first.
Mix
Type S is the usual choice anywhere the wall meets soil or takes lateral load.

Your result

Sample values

17

Bags of mortar

450

Block laid

0.9

Tons of sand

25.5

Cubic feet of mortar

Type N, ⅜ in joints, 10% waste. 80 lb bags.

What to order

What to order
Item Quantity
Mortar mix, 80 lb bags 17 bags
Masonry sand 0.9 tons
Pallets of sand, if bagged 18 bags
Water, approximate 85 gallons

Mortar Calculator: Estimate Mortar Volume and Bags for Brick and Block Walls

Before laying bricks or concrete blocks, you need enough mortar for the joints without ordering excessive material. The deep4sol mortar calculator estimates wet mortar volume and the number of bags required for masonry work. It uses the masonry unit type, unit quantity, joint thickness, mortar type, bag size, and a waste allowance.

It helps bricklayers, homeowners, and estimators plan purchases for brickwork and block masonry, where joint geometry and consumption differ.

What Is a Mortar Calculator?

A mortar calculator estimates the material bonding masonry units. Mortar fills horizontal bed joints and vertical head, or perpend, joints. Consumption depends on unit dimensions, joint thickness, and construction method.

Product yield converts volume into bag quantity. The estimate does not establish mortar strength or structural compliance.

Features, Inputs, and Outputs

The calculator supports brick and block masonry, joint thicknesses, mortar types, bag sizes, and waste.

Mortar calculator inputs and outputs
Input or Output Meaning
Masonry Unit TypeSelected brick or block category
Number of UnitsTotal bricks or blocks to be laid
Joint ThicknessIntended mortar thickness between units
Waste PercentageAllowance for spills, losses, and handling
Mortar TypeSelected masonry mortar formulation
Bag SizePackaged mortar quantity used for ordering
Estimated Mortar VolumeApproximate wet material needed for joints
Total Mortar BagsRounded-up bag quantity including waste

Bag weight does not determine wet volume; check the manufacturer’s yield.

How to Use the Mortar Calculator

  1. Select masonry unit type. Choose the brick or block that matches your project.
  2. Enter the number of units. Use your brick or block takeoff rather than the overall wall area.
  3. Specify joint thickness. Enter the intended bed and head joint thickness according to the project specification.
  4. Choose mortar type. Match the mix designation to the approved construction details.
  5. Select bag size. Use the package size of the mortar you intend to purchase.
  6. Include a waste allowance. Account for material left on boards, spilled during handling, or unusable after mixing.
  7. Check the results. Review estimated mortar volume and the number of complete bags required.

Estimate differing unit sizes and joint specifications separately.

How Is Mortar Quantity Calculated?

Step 1: Estimate Mortar Volume per Unit

For a simplified single-wythe wall of solid rectangular bricks laid in regular courses, the face area occupied by joints per brick module can be estimated as:

Joint Face Area = (L + j) × (H + j) − L × H

  • L = Brick length
  • H = Brick height
  • j = Mortar joint thickness

Multiplying that area by wall thickness, T, estimates the corresponding mortar volume for one brick module:

Mortar per Unit ≈ Joint Face Area × T

All dimensions must use the same unit. This is an idealized geometric method, not a universal formula for hollow blocks, cavity walls, partially filled joints, or unusual bonds.

Step 2: Multiply by Unit Count

Total Mortar Volume = Estimated Mortar Volume per Unit × Number of Units

For hollow concrete blocks, bedding may cover only face shells and specified webs. Use a block-specific estimate.

Step 3: Include Waste

Mortar Volume with Waste = Base Volume × (1 + Waste % ÷ 100)

Waste is additional material for normal installation losses. The percentage should match job conditions, not a universal default.

Step 4: Convert Volume to Bags

Number of Bags = Round Up (Mortar Volume with Waste ÷ Wet Yield per Bag)

Both volume values must be in the same units, such as liters, cubic meters, or cubic feet. Always round up because partially purchased bags are generally not practical.

Worked Example: Mortar for 1,000 Bricks

Consider an illustrative single-wythe wall made from solid rectangular bricks with these dimensions:

  • Brick size: 215 × 102.5 × 65 mm
  • Joint thickness: 10 mm
  • Number of bricks: 1,000
  • Waste allowance: 10%
  • Assumed wet yield: 15 liters per mortar bag

These dimensions resemble a standard UK brick and joint arrangement described by the Brick Development Association.

1. Convert the Brick Dimensions to Meters

Length = 0.215 m; height = 0.065 m; thickness = 0.1025 m; joint = 0.010 m.

2. Calculate Joint Face Area per Brick

(0.225 × 0.075) − (0.215 × 0.065) = 0.00290 m²

3. Calculate Mortar Volume per Brick

0.00290 × 0.1025 = 0.00029725 m³

4. Calculate Total Mortar Volume

0.00029725 × 1,000 = 0.29725 m³

About 297 liters.

5. Add 10% Waste

0.29725 × 1.10 = 0.32698 m³

About 327 liters.

6. Calculate the Number of Bags

327 ÷ 15 = 21.8

Rounded upward, the estimate is 22 bags if each selected bag genuinely yields 15 liters of wet mortar.

That bag yield is hypothetical and must be replaced with the manufacturer’s figure. Real mortar use may differ because of bonding, joint profiles, and workmanship.

How Joint Thickness Changes Mortar Requirements

Thicker mortar joints generally increase mortar consumption, even if the brick count stays the same. For the same illustrative brick dimensions, the simplified geometry gives:

Estimated mortar per 1,000 bricks by joint thickness
Joint Thickness Estimated Mortar per 1,000 Bricks, Before Waste
8 mm0.236 m³
10 mm0.297 m³
12 mm0.359 m³

These are geometric comparisons, not prescribed joint sizes. Follow the specified thickness for proper workmanship.

Mortar Requirements for Brick vs. Block Masonry

Brick masonry typically has numerous horizontal and vertical joints because individual bricks are relatively small. Different bond patterns, wall thicknesses, and header courses can affect the amount of mortar required.

Concrete blocks cover a larger face area per unit, but their hollow cores and bedding practices make direct brick-to-block comparisons unreliable. Filling block cores with grout is normally a separate operation, and grout should not be counted as ordinary joint mortar unless the project specification calls for it.

Avoid applying one generic consumption rate to every unit type.

Mortar Types and Bag Yield

Mortar type influences properties such as bond, workability, strength, and durability. In regions using ASTM terminology, common designations include Type N, Type S, and Type M, but the correct selection depends on the project and governing specifications.

  • Preblended dry mortar is supplied in bags and mixed with the manufacturer’s stated amount of water.
  • Site-batched mortar may use separate cementitious materials and sand, requiring a different purchasing calculation.
  • The calculator’s bag result is most directly useful for a packaged product with a known wet yield.

Never equate a 25 kg, 40 lb, or 80 lb bag with a fixed mortar volume without consulting its product data sheet. Different formulations and moisture requirements may produce different yields.

What Affects Mortar Estimate Accuracy?

Unit Dimensions

Actual brick and block sizes can differ from nominal dimensions.

Joint Thickness

Variations in horizontal and vertical joints change consumption.

Bedding Method

Full bedding and face-shell bedding do not use the same volume.

Bond and Wall Construction

Multi-wythe masonry and header courses may require extra mortar.

Joint Finishing

Recessed, raked, or other profiles can change the final volume.

Workmanship and Waste

Spills, dropped mortar, overmixing, and material that hardens before use increase consumption.

Site measurements can refine complex estimates.

Common Mistakes to Avoid

Using the Wrong Unit Count

Mortar requirements should be based on the masonry units actually being installed.

Ignoring Bag Yield

Package weight cannot be converted into wet mortar volume without product-specific information.

Counting Grout as Mortar

Hollow block core filling is different from bedding and head joints.

Adding Waste Twice

Check whether the displayed bag total already includes your entered waste percentage.

Assuming All Mortar Types Are Interchangeable

Material selection should follow the project’s structural and exposure requirements.

The deep4sol mortar calculator estimates volume and bags for brick and block masonry. Confirm specifications and product yield before ordering.

Questions

Frequently Asked Questions

Ask something else

Mortar quantity depends on brick dimensions, joint thickness, wall construction, and bedding method. For the illustrative 215 × 102.5 × 65 mm brick layout with 10 mm joints, the estimate is about 0.297 m³ before waste.

Divide the estimated wet mortar volume, including waste, by the manufacturer’s wet yield per bag. Round the result upward to determine the number of complete bags required.

Yes. Select the appropriate block unit type and enter the quantity, joint thickness, mortar type, bag size, and waste percentage. Hollow block bedding arrangements differ from those used for solid bricks.

Yes. Thicker bed and head joints generally increase mortar consumption. Even a small thickness change can noticeably affect the total volume when hundreds or thousands of masonry units are involved.

No. Mortar bonds masonry units through bed and head joints, while masonry grout is typically used to fill designated block cores and reinforced spaces. They serve different purposes and usually require separate quantity estimates.

Keep going

All Concrete, Masonry & Stone tools
Estimates, not specifications. Results are based on the values you enter and on typical material properties. Densities, coverage rates and product sizes vary between suppliers, so confirm quantities against your supplier's data before ordering. Structural work must be signed off by a qualified professional and meet your local building code.